Extreme Wells

  • Well Construction
    Project Management (WCPM) – Engineering
  • Key activities during the engineering phase are:

    • Well engineering/design/risk analysis and feasibility options
    • Integration with other disciplines to develop a robust design/program
    • Mud system design and specification including environmental considerations
    • Optimized casing scheme design and specification
    • Directional drilling design and specification
    • Data acquisition and evaluation planning
    • Pore pressure prediction and management (optional)
    • Design of testing and completion
    • Rig selection and specification
    • Cost and schedule estimates for both individual wells and programs